Chapter 2. ZONING DISTRICTS  


§ 2.1. Purpose.
§ 2.1.1. Interpretation.
§ 2.2. General Provisions; Exceptions and Modifications.
§ 2.2.1. Relationship of Buildings to Lot.
§ 2.2.2. Every Lot Must Abut a Street.
§ 2.2.3. Lot of Record.
§ 2.2.4. Front Yard Setbacks for Dwellings.
§ 2.2.5. Height Limitation Exceptions.
§ 2.2.6. Building Setback Exceptions.
§ 2.2.7. Double Frontage Lots.
§ 2.2.8. Visibility at Intersections.
§ 2.2.9. Exemption of Electric Transmission and Distribution Poles, Towers, and Lines.
§ 2.2.10. Open Space Requirements.
§ 2.2.11. Reduction of Lot and Yard Areas Prohibited.
§ 2.2.12. Outdoor Lighting.
§ 2.2.13. Mobile Home HUD Requirements.
§ 2.3. Zoning Districts.
§ 2.3.1. Primay Use District Conversion.
§ 2.4. A-C Agricultural Conservation District.
§ 2.4.1. Intent.
§ 2.4.2. Other Requirements.
§ 2.4.3. Uses.
§ 2.5. R-A Residential Agricultural District.
§ 2.5.1. Intent.
§ 2.5.2. Other Requirements.
§ 2.5.3. Uses.
§ 2.6. RU-R Rural Residential District.
§ 2.6.1. Intent.
§ 2.6.2. Other Requirements.
§ 2.6.3. Uses.
§ 2.7. R-R Resort Residential District.
§ 2.7.1. Intent.
§ 2.7.2. Other Requirements.
§ 2.7.3. Uses.
§ 2.8. R-20 Single-Family Residential District.
§ 2.8.1. Intent.
§ 2.8.2. Other Requirements.
§ 2.8.3. Uses.
§ 2.9. R-12 Single-Family Residential District.
§ 2.9.1. Intent.
§ 2.9.2. Other Requirements.
§ 2.9.3. Uses.
§ 2.10. R-8 Single-Family Residential District.
§ 2.10.1. Intent.
§ 2.10.2. Other Requirements.
§ 2.10.3. Uses.
§ 2.11. R-O Residential Office District.
§ 2.11.1. Intent.
§ 2.11.2. Other Requirements.
§ 2.11.3. Uses.
§ 2.12. O-I Office-Institutional District.
§ 2.12.1. Intent.
§ 2.12.2. Other Requirements.
§ 2.12.3. Uses.
§ 2.13. N-B Neighborhood Business District.
§ 2.13.1. Intent.
§ 2.13.2. Other Requirements.
§ 2.13.3. Uses.
§ 2.14. H-B Highway Business District.
§ 2.14.1. Intent.
§ 2.14.2. Other Requirements.
§ 2.14.3. Uses.
§ 2.15. G-B General Business District.
§ 2.15.1. Intent.
§ 2.15.2. Other Requirements.
§ 2.15.3. Uses.
§ 2.16. M-1 Light Manufacturing District.
§ 2.16.1. Intent.
§ 2.16.2. Other Requirements.
§ 2.16.3. Uses.
§ 2.17. M-2 Heavy Manufacturing District.
§ 2.17.1. Intent.
§ 2.17.2. Other Requirements.
§ 2.17.3. Uses.
§ 2.18. Conditional Zoning Districts.
§ 2.18.1. Intent.
§ 2.18.2. Uses.
§ 2.19. Overlay Districts.
§ 2.19.1. Purpose.
§ 2.20. Permitted Uses.
§ 2.20.1. Purpose.
§ 2.20.2. Entries.
§ 2.20.3. Meaning of Entries.
§ 2.20.4. Determining Permitted Uses, Principal Uses and Mixed Uses.
§ 2.21. Table of Permitted and Special Uses.
§ 2.21.1. Agricultural and Residential Uses.
§ 2.21.2. Recreational, Educational, and Institutional Uses.
§ 2.21.3. Commercial Uses.
§ 2.21.4. Manufacturing and Industrial Uses.
§ 2.21.5. Public Works Facilities, Utilities, and Infrastructure Uses.